Towing Tank Testing for Motor Yacht Performance and Seakeeping

Calm water, seakeeping and interceptor trim optimisation study completed for a 57m motor yacht for Van Oossanen Naval Architects and Heesen Yachts.

Van Oossanen Naval Architects Logo
Heesen Yachts Logo

Tank Testing Case Study

The Challenge

One of our clients, Van Oossanen Naval Architects, sought to assess the performance of a new super yacht design to ensure that contractual speed, range and seakeeping performance were met. The project required an optimisation sweep of interceptor trim devices, measurement of vessel’s calm-water resistance at several off-design loading conditions, and assessment of seakeeping behaviour in head seas by measuring accelerations at various locations.

The client needed accurate, reliable experimental data to ensure that performance would be as expected.  With tight project timescales, we work to make sure that projects are completed as fast as possible. In this case, the final report was sent two months after we received the hull lines. Some projects can be longer depending on several factors including: tank availability, model maker capacity and project complexity.

Render of 57m Heesen Motor Yacht which was tank tested by the Wolfson Unit

Tank Testing Case Study

The Result

The testing programme delivered a clear understanding of the vessel’s hydrodynamic characteristics and provided confidence in the design prior to construction.

Key outcomes included:

  • Quantification of interceptor performance and selection of the optimum interceptor configuration.
  • Identification of the vessel’s calm-water resistance characteristics across its operating envelope. Allowing the ship yard to confidently fit engines which would achieve the required speeds while also being economical on fuel.
  • Detailed assessment of vessel motions and accelerations in head seas to provide increased confidence in operational capability and passenger comfort predictions.

By combining resistance, interceptor, and seakeeping investigations within a single testing programme, the client obtained the evidence needed to validate the design, reduce technical risk, and inform future decisions in the project with confidence.